top of page

Expertise in Foundation,

Structural, and Retrofit

Contact Baily General for a bid today, and we will pick up the permits from the Department of Building Inspection for FREE.

SCROLL

Deadline for Tier 3 Properties to Complete Seismic Retrofit Work is September 15

dash3.png
dash1.png
shutterstock_479441956.jpg
Preventative
Siezmic Retrofit

Design is at the core of what we do. Clean lines, satisfying space, and appropriate use of color, size, and shape all come together to complete our definition of high quality aesthetic and our goal of absolute customer satisfaction.
 

During this part of the process, we collaborate with you to hand-pick top-tier designers, engineers, and architects whose vision matches your style, ensuring total alignment with your project goals. Our open and collaborative approach means no aspect is overlooked as we bring your design to life with meticulous attention to detail.

During Pre-Construction, we work with you and your designers to select, order, and schedule delivery of all the materials, colors, textures, and hardware to bring your vision to life. 

 

We will plan and schedule the entire project accordingly to avoid unnecessary delays, mitigate budget inflation, and ensure construction progression.

shutterstock_540338284.jpg
New Contruction
Structural
shutterstock_786092152.jpg
Additions
Foundation

Construction is when our master craftsmen at Bailey General shape, mold, and craft your vision into reality. During this part of the process, we promote constant communication between you, the designers, and the crew.

 

We believe in total transparency throughout the process and will provide you with a steady stream of up-to-date information as we work through our production calendar and manage your construction budget.

dash2.png
blueprint1.png
SERVICES

– MANDATORY SIEZMIC RETROFIT –

The Mandatory Soft Story Retrofit Program (MSSP) was created in 2013 as a multi-year community-based effort led by the Earthquake Safety Implementation Program and enforced by the Department of Building Inspection to ensure the safety and resilience of San Francisco's housing stock through the retrofit of older, wood-framed, multi-family buildings with a soft-story condition.

As part of this program, all affected property owners were noticed beginning in September 2013 and were required to have submitted their screening forms to DBI by September 15, 2014. DBI has achieved over a 99% response to the program. Buildings that have not complied with this requirement have been placarded and issued Notices of Violation (NOV).

We encourage property owners of soft story buildings to take the necessary steps to comply with program requirements by filing for a permit to ensure their properties are seismically safe in anticipation of the next big quake. 

ABOUT
PROJECTS

– GALLERY –

See some of our most recent projects.

CLIENTS

– CONTACT –

Please fill out the adjacent form and we'll get back to you as soon as we can. We look forward to hearing from you.

Success! Message received.

CONTACT
  • Houzz - White Circle
  • Instagram - White Circle

BAILEY GENERAL CONTRACTING CO.

License # 917919

1485 Bayshore Blvd. Suite 186

San Francisco, CA 94124

T: 415.592.8888

E: info@baileygeneral.com

bottom of page